Our company was approached by a healthcare company with a 96-bed Mobile Hospital unit that faced phased-out service due to improper maintenance and structural design flaws. The client requested an overhaul to rectify these issues and enable setup in designated service areas.
Over a two-month period, structural, electrical, HVAC, plumbing, and respiratory gas facilities issues were addressed, along with hospital equipment installation and rectification. Following these modifications, operational status was achieved by the hospital, resulting in the following improvements:
- The hospital now accommodates 400 patients daily, reaching its maximum service capacity.
- Infrastructure improvements enabled the hospital to operate 24/7.
- Structural modifications allowed some hospital components to function independently from the main structure.
- On-site support personnel, including repair and maintenance services, were provided outside urban and commercial infrastructures, ensuring immediate response to equipment breakdowns.